To
ensure that all of the Department's facilities
are continually maintained by holding to the
highest possible standards of performance
and appearance in all phases of our work scope;
to maintain the stock of the central warehouse
in order to achieve uninterrupted service
to our customers; continue with the evaluation
of all the equipment for which this division
is responsible; to provide the equipment with
the longest life, obtain the most economical
and continuous performance of all the systems
accouterments; to provide training for development
and continue to meet the changing safety requirements
of the members of the Plant and Equipment
Maintenance staff.
|
| |
 |
| |
All
equipment within the wastewater treatment
plant, all corrective and preventive maintenance
at the water pump stations, and corrective
and some preventive maintenance at the wastewater
lift stations. |
| |
 |
| |
|
Repond
to service requests - prioritize each request
as they are received to determine which has
the highest priority. Close all service requests
as soon as the work has been completed. |
| |
|
|
| |
|
Repond
to work orders - prioritize each work order,
be it preventive, corrective, modification
or an emergency, as they are received. Determine
what has the highest priority and order parts
and materials as needed. Close all work orders
as soon as the work has been completed entering
parts, labor and other detailed information
used to perform the job to track equipment
history and costs. |
| |
|
| |
|
Evaluate
System Equipment - this is an on-going procedure
where equipment is evaluated for repair or
replacement or installation of new more efficient
equipment. This process is particularly important
since we have equipment that is a year or
less in age to equipment that is over forty
years old. |
| |
|
| |
|
Maintain
Buildings & Structures - on-going inspections
of all the buildings and tanks that make up
the wastewater treatment plant, all of the
water system structures and the wastewater
pumping stations. The inspections include
but are not limited to roofing material condition,
crack repair in concrete and stucco structures;
inspection of the inside of the various tanks
and reservoirs throughout the water and wastewater
systems. |
| |
|
| |
|
Follow
Established Safety Programs - strictly follow
established safety procedures such as confined
space entry, fall protection, hazardous gas
monitoring, use of personal protective equipment
and to keep up with the latest procedures
and equipment for the protection of our personnel
and the public. |
| |
|