CITY
OF DALY CITY
BUILDING PERMIT FEE SCHEDULE
2002
Amends
Chapter 1, entitled Administration, of the 2001 California
Building Code, providing for the collection of fees thereof.
BUILDING
PERMIT FEES
A
fee for each building permit shall be paid to the City of
Daly City, as set forth in Table
l-A.
The
valuation to be used in computing the permit and plan check
fees shall be the total value of all construction work for
which the permit is issued, as well as all finish work,
painting, roofing, electrical, plumbing, heating, air conditioning,
elevators, fire-extinguishing systems, and any other permanent
work or permanent equipment. Moveable office furnishings,
appliances, stored vehicles, or stock inventories are not
to be included in the valuation.
The
determination of value or valuation under any of the provisions
of this Code shall be made by the Authorized Representative.
The
cost per square foot shall be calculated according to the
Building Valuation Data schedule listed in the most current
issue of Building Standards Monthly, which is printed and
circulated by the International Conference of Building Officials.
All Modifiers are to be applied as well as the column indicating
"Good Construction". Said schedule shall be filed
in the Building Division Office.
| Supplementary
Valuation Data |
FEES |
| a. |
The
costs per square foot for one and two family dwellings
with additional rooms constructed in either the garage
or basement area. |
$30 |
| |
|
|
| b.
|
The
costs per square foot for tenant improvement work
in commercial buildings |
$40 |
| |
|
|
BUILDING
DIVISION PLAN REVIEW FEES
When
a plan or other data are required are to be submitted, a
plan review fee shall be paid at the time of submitting
plans and specifications for review. Said plan review fee
shall be 65 percent of the building permit fee. The plan
review fees are separate fees from the Building Permit fee.
When
plans are incomplete or changed so as to require additional
plan review, an additional plan review fee may be charged,
if deemed necessary by the Authorized Representative. Additional
fee shall be 65 percent of the building permit fee.
Additional
plan review fees required by changes, additions or revisions
to approved plans shall be charged at 1.25 times the reviewers
hourly rate (one hour minimum).
PLANNING
DIVISION PLAN REVIEW FEES
The
Planning Division review fee shall be collected at the same
time as the Building Division Plan Review Fee.
FIRE
DEPARTMENT PLAN REVIEW FEES
The
Fire Safety plan review shall be collected at the same time
as the Building Division Plan Review Fee.
ENERGY
FEES
The
Building Division will collect a fee in the amount of 20%
of the building permit fee at the time of permit issuance,
a combination fee for plan review and inspection of Title
24 energy requirements.
MICROFILM
FEE
The
fee is to be charged at the rate of 5% of the building permit
fee. For permits under $60 the minimum fee will be $3.
| OTHER
INSPECTIONS AND FEES FEES |
FEES |
| |
|
Inspection
outside of normal business hours
(Minimum Charge - one hour). |
TWO
TIMES
HOURLY RATE |
| |
|
Inspection
for which no fee is specifically indicated
(Minimum Charge - one hour). |
HOURLY
RATE |
| |
|
| A
reinspection fee shall be assessed for each inspection
or reinspection when such portion of work for which
inspection is called is not complete or when corrections
called for are not made (Minimum Charge - one hour).
|
HOURLY
RATE |
ENFORCEMENT
FEES
Fees
will be charged in the amount equal to costs incurred by
the Building Division staff. These costs will include all
time incurred by the Building Division. Hourly rates will
include supervision, overhead, equipment, hourly wages and
fringe benefits of the employees. These fees shall only
be charged in the amount over and above the investigation
fee.
INVESTIGATION
FEES
Whenever
any work has commenced for which a permit is required without
first having obtained said permit, a special investigation
shall be made before a permit may be issued for such work.
An
investigation fee, in addition to the permit fee, shall
be collected whether or not a permit is then or subsequently
issued.
Investigation
Fees:
1st
time offenders - equal to the amount of the permit fee
2nd
time offenders - three times the amount of the permit fee.
3rd
or more time offenders - ten times the amount of the permit
fee.
The
payment of such investigation fee shall not exempt any person
from compliance with all provisions of this code nor from
any penalty prescribed by law.
This
provision shall not apply to emergency work when it shall
be provided to the satisfaction of the Authorized Representative
that such work was urgently necessary.
| ADMINISTRATIVE
FEES |
FEES |
| |
|
| Processing
fee for the issuance of a temporary certificate of
occupancy (non-refundable) |
$250 |
| |
|
| A
cash deposit shall be collected at the time of issuance
of the Temporary Certificate of Occupancy in the amount
of 1.25 times the valuation of the work outstanding.
The valuation is as determined by the administrative
authority. Upon failure of the applicant to complete
the work on time as agreed, the City may cause the
work to be done. This fee is refundable in its entirety
upon successful completion of the work by the applicant
or partially refundable if the City incurs expense
causing said work to be done. |
|
| |
|
| Change
of address |
$150 |
| |
|
| Extension
of time on either a permit or permit application |
$30 |
| |
|
| REPRODUCTION
& DISSEMINATION OF PUBLIC INFORMATION |
FEES |
| |
|
| Microfilm
hard copy (minimum charge $7) |
$1.50/page |
| |
|
| Computer
Research (one quarter hour minimum plus $0.50 each
page) |
HOURLY
RATE |
| |
|
| Facsimile
transmission $2.50 for up to three pages plus $0.60
for additional pages) |
|
| |
|
RESIDENTIAL
REQUIREMENTS REPORT FEES
3R report fees shall be collected in the amount of $45/report
FEES
REFUNDS
The
Authorized Representative may authorize the refund of any
permit fee paid when no work has been done under a permit
issued in accordance with this code, or for a permit, which
has been paid and is withdrawn or cancelled. The refund
shall be the amount paid less $75.
Alquist Priolo Geologic Hazard Act - Fee Collection
The
Building Division of the Department of Economic and Community
Development shall collect a fee from each applicant for
a building permit within the special studies zones heretofore
designated valuation of the proposed construction for which
the building permit is issued, as determined by the Chief
Building Inspector.
Strong Motion Instrumentation Program
The
Building Division of the Department of Economic and Community
Development shall collect a fee from each applicant for
a building permit, which fee for residential property shall
be equal to seven (7) cents per thousand dollars valuation
or fifty cents, whichever is higher. Fees for commercial
property shall be equal to fifteen (15) cents per thousand
dollars valuation or fifty cents whichever is higher. Fees
collected shall be deposited in the Strong Motion Instrumentation
Special Fund of the State Treasury.
|