City News

Slurry Seal 2014 Comes to Original Daly City, Civic Center and Hillside Blvd Neighborhoods

Pavement improvements on select streets in the Original Daly City and Civic Center neighborhoods and on Hillside Boulevard will be completed as part of Daly City's annual Street Slurry and Cape Seal program. This work is scheduled to occur between July and September 2014.

Crack sealing and pavement marking removal will occur prior to slurry/cape sealing work and will not affect the drivability of streets or the general ability to park. Limited parking restrictions may be enforced due to pothole repair work in advance of slurry and cape sealing. Preparatory work is tentatively scheduled for the week of July 21, 2014 through July 31, 2014.

On the day of slurry seal work, please do not park your vehicle on the posted streets or it will be towed at the owner’s expense in order for the contractor to perform his work. Please do not drive on, into or from closed lanes or on a street with the street closure barricades in place. Barricades are an indication that the slurry seal is wet. Driving or walking on the wet slurry can result in significant damages to the street surface and cause the black tar-like substance to adhere to your car tires or shoes and track on driveways and sidewalks.

For more information including maps of the exact streets being treated and specific schedules, click here.